Taizhou Experienced Injection Mould for Plastic Juicer Blender
Taizhou Experienced Injection Mould for Plastic Juicer Blender ;
Basic Info.
Model NO. | JSL-T21619-17 |
Application | Household Appliances |
Runner | Hot /Cold |
Design Software | Ug,PRO-E,Solidwork |
Installation | Fixed |
Certification | ISO |
Standard | Dme/Hasco/Lkm Ect |
Customized | Customized |
After-sales Service | Lifelong |
Automatically by CNC | Nitriding, etc |
Mould Operating Mode | Automatically by CNC |
Mould Report | 7-10days Per Time |
T1 Sample | 50days |
Mould Design | 7days |
Machine Equipment | CNC,EDM,Wire Cutting Machine,Drilling/Grinding |
Mould Cooling System | by Experienced Designer |
Mould Name | S50c/C45 |
Mould Quality Control | Professional QC in House Machine |
Transport Package | Wooden Crate |
Specification | AS Requirement |
Trademark | JSLMOULD |
Origin | China |
HS Code | 8480719090 |
Production Capacity | 500 Sets/Per Year |
Product Description
Product Name | Taizhou Experienced Injection mould for plastic juicer blender |
Product material | ABS/pp/pc |
Core& Cavity Steel | 1.2738 |
Steel hardness: | HRC34-38 |
Mould Standard | DME |
Cavity Number | 1 |
Injection System | side gate |
Ejector System | ejector pin |
Cycle Time | 45s |
Tooling lead time | 60days |
Mould life | 500, 000 |
Quality assurance | ISO9001 |
Our Advantage | 1. High quality |
2. Reasonable price | |
3. On time delivery | |
4. Good After-sale service | |
5. Strict quality control | |
6. All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. |
You may also like
Send inquiry
Send now