banner
Products
Our online service is open all day, every day.
Hair Drier Plastic Injection Mould

Hair Drier Plastic Injection Mould

Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML;
Basic Info.
Model NO. RTPM-2015025
Runner Cold Runner
Installation Fixed
Certification ISO
Customized Customized
Lead Time 20-30 Days
Mould Base Yudo
Cavity 1X1
Core Steel P20
Transport Package Wooden Box
Specification CE/SGS/RoSH
Trademark Root
Origin Qingdao Shandong
HS Code 8480710090
Production Capacity 360 Sets/Year
Product Description

Hair Drier Plastic Injection Mould

Hair Drier Plastic Injection Mould

Hair Drier Plastic Injection Mould

Hair Drier Plastic Injection Mould


Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.Advantage:High quality & competitive price & professional skills.In house strict quality control.On time delivery.All mold could be produced automaticallySpecification:Item: Plastic Injection MoldPart Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVCCore &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407Mold Base Steel: P20/1050/S50C/Runner: Hot or ColdGate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring GateCavity No: Single or Multiple.Mold Base Standard: DME/LKM/HASCO/Etc.Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.Mold Life: 30k-1, 000 kCycle Time: 10-120 sLead Time: 30-45 daysInjection Machine: 50-1200 TonOffered Service:Mold progress report and tooling schedule will be provided weekly.The first testing sample for buyer's inspection and work out improvement requirements will be provided.Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.Payment and DeliveryPayment: TT 50% in advance, Balance before shipmentDelivery Time: 30-45 days
Specification
Design Software:UG/CAD
Analysis Software:Moldflow
Preferred Formats:STP/IGES/UG
Design Time:7-15 days
Manufacture Time:20-30 days
Delivery Time:30-45 days
The information has been udated on 2017-06-20.
Send inquiry